Conditional grantDecided 04 October 2023Carlow County Council

2360011: Permission for the erection of a dwelling house,garage, installation of a treatment plant and percolation area and all associated site works

Kyle, Ballymurphy, Co.Carlow
DecisionConditional grant
Decided04 October 2023
Application typePERMISSION
Source documents7

Site

What is on file

0refusal reasons16conditions8nearby records

Decision details

Core application dates and identifiers from the public planning record.

Planning analysis

Refusal reasons and planning conditions extracted from the public decision file.

Refusal reasons

No refusal reason

No refusal reason is on record for this application yet.

Conditions

  • 1Build in accordance with plans received 07/02/2023 and FI response 08/09/2023.Compliance
  • 2Permission relates only to development detailed in plans received 08/09/2023.Compliance
  • 3First occupied as permanent residence by applicants for 7 years. Section 47 agreement required before works start.Occupancy
  • 4External finishes per elevational drawings. Neutral plaster, indigenous stone cladding. No white uPVC.Design Materials
  • 5Garage use incidental to dwelling only. No self-contained unit or commercial activity.Other
  • 6Landscaping per Drawing Ref July 23. Plant in first season, protect, replace failures within 5 years.Landscaping Boundary
  • 7Gravelled driveway surface. DMRB sightlines. Simple gateway max 1.5m using local stone.Traffic Access
  • 8Do not impair existing drainage. No surface water to road/adjacent properties. Soakaways per BRE Digest 365. Road opening licence required.Wastewater Drainage
  • 9Separate discharge: clean surface water to soakpits, foul waste to treatment system.Wastewater Drainage
  • 10Wastewater system per EPA Code of Practice (P.E. ≤ 10) 7 June 2021. Certificate of Compliance, flush valve, impervious layer, I.S. EN 12566 testing, grease trap, no surface water infiltration.Wastewater Drainage
  • 11Irish Water connection requires agreement and compliance with CDS Technical Documentation.Water Services
  • 12Off-carriageway parking for construction traffic. No road parking. Prevent muck/debris. Control noise/dust.Construction Management

Source documents

Original council portal records and source PDFs where available.

Nearby precedent

Similar nearby applications linked to this planning decision.