Conditional grantDecided 21 June 2024Carlow County Council

2460042: Planning permission to construct a single storey dwelling, detached single storey garage, new entrance, septic tank and percolation area, bored well and all associated site works

Kyle, Ballymurphy, Borris
DecisionConditional grant
Decided21 June 2024
Application typePERMISSION
Source documents5

Site

What is on file

0refusal reasons15conditions8nearby records

Decision details

Core application dates and identifiers from the public planning record.

Planning analysis

Refusal reasons and planning conditions extracted from the public decision file.

Refusal reasons

No refusal reason

No refusal reason is on record for this application yet.

Conditions

  • 1Development must follow approved plans received 27/02/2024 as amended by FI received 29/05/2024.Compliance
  • 3Dwelling must be first occupied as permanent residence by applicants and immediate family for 7 years. Section 47 agreement required before works start.Occupancy
  • 4External finishes per approved elevational drawings. Natural stone must be indigenous to the area.Design Materials
  • 5Garage use strictly incidental to the dwelling. No self-contained unit or commercial activity permitted.Other
  • 6Landscaping per approved plan by Landscape Design & Planning Limited. New planting in first season; replace failures within 5 years.Landscaping Boundary
  • 7Lines of sight at road entrances per DMRB. Road opening licence required prior to commencement.Traffic Access
  • 8Height of site entrance wing walls and piers capped at 1.2 metres.Design Materials
  • 9Do not impair existing drainage. Surface water directed to soakaways per BS 8301:1985 and BRE Digest 365. Only clean surface water to soakaways; foul to on-site WWTS.Wastewater Drainage
  • 10Connection agreement with Uisce Éireann required before works start. Comply with CDS Technical Documentation. Diversion/build over requires written approval.Water Services
  • 11On-site WWTS and percolation area per EPA Code of Practice (July 2021). Certificate of Compliance required before occupation. Grease trap, activated carbon filters, and specific pipe sealing/levelling requirements apply.Wastewater Drainage
  • 12Off-carriageway parking for construction traffic. Prevent debris on public road. Site kept neat. Noise/dust controlled. No materials on public road without consent.Construction Management
  • 13Construction hours restricted to Mon-Fri 08:00-18:00 and Sat 08:00-13:00. No work on Sundays or Bank Holidays.Construction Management

Source documents

Original council portal records and source PDFs where available.

Nearby precedent

Similar nearby applications linked to this planning decision.