Conditional grantDecided 14 February 2025Carlow County Council

2460194: The restoration and conversion of an existing vernacular stone shed, construction of a single & two story extension to the rear and side to form new dwelling, domestic garage, domestic well, onsite wastewater treatment plant and percolation area along with all associated site and landscaping works including enhancement to an existing site entrance, including a Natura Impact Statement ( NIS)

Newtown, Bagnelstown, Carlow
DecisionConditional grant
Decided14 February 2025
Application typePERMISSION
Source documents6

Site

What is on file

0refusal reasons18conditions8nearby records

Decision details

Core application dates and identifiers from the public planning record.

Planning analysis

Refusal reasons and planning conditions extracted from the public decision file.

Refusal reasons

No refusal reason

No refusal reason is on record for this application yet.

Conditions

  • 1Development in accordance with plans received 10/07/2024 as amended by FI received 16/12/2024.Compliance
  • 2Permission authorises development as described in public notices and plans received.Compliance
  • 3Dwelling first occupied as permanent residence by applicants & immediate family for 7 years. Section 47 Agreement required prior to commencement. Statement of first occupation within 2 months.Occupancy
  • 4External finishes per drawings 23018 PL 007 A & 23018 PL 008 A (16/12/2024). Neutral render. No white uPVC for windows/doors/rainwater goods.Design Materials
  • 5Garage used solely incidental to dwelling. No self-contained dwelling or business use.Other
  • 6Landscaping/boundaries per drawings 23018 PL 002 A & 23025 PL 003. New hedgerow min 4-5 yrs growth, indigenous species. Plant in first season post-completion. Replace failures within 5 years.Landscaping Boundary
  • 7Lines of sight at entrance per drawing 23018 PL 002 A & DMRB. Consult MD Engineer before interfering with public road. Road opening licence per Guidelines (2017) prior to commencement.Traffic Access
  • 8Site entrance wing walls/piers height max 1.2m.Design Materials
  • 9Do not impair existing drainage. No surface water to public road/adjoining properties. Collect/dispose to soakways per BS 8301:1985 & BRE Digest 365 with inspection manholes. Only clean surface water to soakaways.Water Services
  • 10CEMP submitted prior to commencement per template, including NIS & Bat/Bird Survey mitigation. CEMP available on site during construction.Construction Management
  • 11NIS & Bat/Bird Survey mitigation strictly adhered to and implemented in full.Environment Ecology
  • 12Uisce Éireann connection agreement prior to commencement if connecting to public network. Comply with CDS Technical Documentation. Divert/build over services with written approval. Separation distances per Codes of Practice.Water Services

Source documents

Original council portal records and source PDFs where available.

Nearby precedent

Similar nearby applications linked to this planning decision.