Conditional grantDecided 14 March 2025Carlow County Council

2460224: A material change of use to the existing dwelling to renovate it back to a habitable condition, an extension to provide an additional en-suite bedroom and additional kitchen area, the reconstruction of a draught lobby and a new septic tank and percolation area, a new front entrance and all other associated site works

Rathmore, Tullow, Co. Carlow
DecisionConditional grant
Decided14 March 2025
Application typePERMISSION
Source documents6

Site

What is on file

0refusal reasons13conditions8nearby records

Decision details

Core application dates and identifiers from the public planning record.

Planning analysis

Refusal reasons and planning conditions extracted from the public decision file.

Refusal reasons

No refusal reason

No refusal reason is on record for this application yet.

Conditions

  • , Complete development per approved plans received 30/07/2024, amended by FI responses 12/11/2024 and 23/02/2025.Compliance
  • , Permission limited to development described in public notices and application.Compliance
  • , External finishes per elevational drawings (TD-PP-004, received 30/07/2024).Design Materials
  • , Retain landscaping per Site Layout Plan (TD-PP-002, received 23/02/2025). New planting in first season, replace failures within 5 years.Landscaping Boundary
  • , Provide sightlines per DMRB prior to other works. Remove hedge west of cow shed per Sightlines Drawing (TD-PP-006, received 23/02/2025). Obtain Road Opening Licence per Guidelines (2017) prior to commencement.Traffic Access
  • , Site entrance wing walls and piers height shall not exceed 1.2 metres.Design Materials
  • , Do not impair drainage. No surface water to public road/adjoining properties. Dispose to soakways per BS 8301:1985 and BRE Digest 365 with inspection manholes. Only clean surface water to soakaways.Water Services
  • , Sign Uisce Éireann connection agreement prior to commencement. Comply with CDS Technical Documentation. Obtain written approval for diverting/building over services. Adhere to separation distances. Subject to Capital Investment Programme constraints.Water Services
  • , On-site wastewater system per EPA Code of Practice (PE ≤ 10, 7 June 2021). Submit Certificate of Compliance prior to occupation. Test septic tank per I.S. EN 12566. Prevent surface water infiltration. Install grease trap. Ensure vents, max 6 distribution pipes, liquid levelling devices, and activated carbon vent filters (replenish bi-annually).Wastewater Drainage
  • , Provide off-carriageway parking for construction traffic; no parking on public road. Prevent debris on public road. Maintain neat site with skips on site. Control noise/dust. No materials on public road/sightline areas without consent.Construction Management
  • , Construction hours restricted to Mon-Fri 08.00-18.00 and Sat 08.00-13.00. No work on Sundays/Bank Holidays without prior written approval.Construction Management
  • , Relocate service poles prior to construction at applicant expense. All cables underground except as agreed.Traffic Access

Source documents