20712: The development consists of the construction of a slatted unit and associated site works
Culleen, Drumline, Co Clare
DecisionConditional grant
Decided23 November 2020
Application typePERMISSION
Source documents5
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason
No refusal reason is on record for this application yet.
Conditions
No conditions
No conditions are on record for this application yet.
Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
- Chief Executives OrderSource: clarecoco.eplanning.ie / 74ff2ff0-5d77-4c1e-88b7-e0ba47cd63a3.PDF / Document 517948Source PDF
- Final GrantSource: clarecoco.eplanning.ie / Bde91293-88ed-4c8d-8c73-ebcc9d654ca3.PDF / Document 523576Source PDF
- Planners ReportSource: clarecoco.eplanning.ie / 818bf180-c1a1-486c-8603-cac1a922d466.PDF / Document 517950Source PDF
- Planners ReportSource: clarecoco.eplanning.ie / A4a34edc-ea07-4c00-a0b7-93a0a46c54b2.PDF / Document 517951Source PDF
Nearby precedent
Similar nearby applications linked to this planning decision.- 21347For development - the development consists of the construction of an new entrance onto public road, the construction of a road from that entrance of a road from that entrance using inert soil and stone class (170504) and using concrete class (170101) into farmyard and associated site works / 0.3 km away / 19 August 2021Conditional grant
- 25260For the development this site at the townlands of Mogullaan, Crossagh, Rathlaheen South, Culleen, Drumline and Ballycasey Beg, Co Clare. Planning Permission is sought for a duration of 10 years, with an operational life of 35 years from the date of commissioning. The proposed development comprises the construction and operation of a solar photovoltaic (PV) farm on a site of approximately 95 hectares. The project includes: (i) Ground-mounted solar arrays supported by steel frames, with an internal network cable facilitating connection to the Drumline 110kV substation. An internal network cable will be installed to enable an under-the-fence connection from the onsite transformer compound to the adjacent substation. The transformer compound will include an Independent Power Producer (IPP) building, a 110kV transformer, and an 18-metre-high lightning monopole mast. (ii) Underground electrical cabling and ducting, security fencing, CCTV stands. (iii) New internal access tracks and site entrance. (iv) Site drainage. (v) All ancillary site development works and apparatus. A Natura Impact Statement will also be submitted to the Planning Authority with this application / 0.6 km away / 14 November 2025Conditional grant
- 21697To construct a single dwelling house, advanced water treatment system and ancillary site works. / 0.6 km away / 13 January 2022Conditional grant
- 23454To renovate and extend existing dwelling house, connect to new wastewater treatment system and carry out all ancillary site works / 0.6 km away / 13 October 2023Conditional grant
- 22330For the construction of a detached single storey garage with single storey granny flat appended, connection to existing wastewater treatment system and percolation area, and all ancillary site and landscaping works / 0.8 km away / 01 June 2022Conditional grant
- 2560529For (a) 12 no. 2MW Hydrotreated Vegetable Oil (HVO) generators; (b) 6 no. self-bunded 69m3 HVO tanks; (c) 6no. self-bunded 6m3 AdBlu tanks; (d) a 182m2 electrical/control building: (e ) a customer electrical compound complete with a transformer; (f) an ESB compound connected to the existing adjacent 110kV ESB substation situated immediately east of the proposed development; (g) a fuel loading bay complete with a 7,700L forecourt separator; (h) on site surface soakaways; (i) task lighting columns; (j) 3m high perimeter security fencing and compound separation; (k) new road entrance off the R458; (l) all associated internal access roads, car parking, surface water collection, ducting as required to deliver the works. The proposed development will include connection to public water mains. There is no sewer connection required as foul and process waste will be collected in an underground sealed tank and emptied by a specialist waste service provider. An Appropriate Assessment Screening Report has been prepared for the site. The application relates to a development which comprises an activity requiring an industrial Emissions Directive (IED) licence. / 0.9 km away / 23 October 2025Conditional grant
- 22810To erect signage to logistics (warehouse and distribution) building / 0.9 km away / 03 November 2022Conditional grant
- 19994To construct logistics (warehouse and distribution) building with photo-voltaic arrays on the roof with supporting offices, signage, flag poles, HGV, car and cycle-parking, service yard, new vehicular entrance/exit, connection to existing estate sewers, ESB sub-station, landscaping, boundary treatment and all ancillary site works necessary to facilitate the proposed development / 0.9 km away / 21 February 2020Conditional grant