2560155

A 10 year permission for a Battery Energy Storage system. The proposed development will comprise of the following; A Battery Energy Storage System with associated infrastructure including a new internal access road, approximately 50 metres in length to the permitted Garreenleen Solar Farm (Planning Ref. 22163); An approximately 90 metre 33kV double circuit underground cable grid connection to the permitted Bendinstown 110kV Substation (Planning Ref. ABP–313139), to be installed in an excavated trench including underground ducting; Modular office and welfare buildings; Six steel storage containers and all associated site development and reinstatement works. A Natura Impact Statement (NIS) has been prepared and is included with this planning application.

Within the townlands of Gilbertstown and Bendinstown, Co. Carlow, IrelandCarlow County CouncilPERMISSION0 reasons35 conditions
Refused25 February 2026
2560220

A 5-year permission for temporary development at Bendinstown (townland) in County Carlow. The development will consist of the installation of 3 no. single storey porta cabin units for use as office (2 no.) and storage space (1 no.), 6 no. car parking spaces and all associated site development works. The proposed development will serve the Garreenleen Solar Farm Development (as permitted under Carlow County Council Reference 20/143 / An Bord Pleanála Reference ABP-307891-20). The proposed operational development will be accessed via the L7112 local road via the entrance permitted under An Bord Pleanála Reference ABP-313139-22

Bendinstown, (townland), Co CarlowCarlow County CouncilPERMISSION0 reasons7 conditions
Granted23 September 2025
2460295

For a ten-year planning permission for a renewable energy development comprising the construction of a c. 63MW solar farm of 118.9ha and associated works in the Townlands of Rathrush, Emlicon and Bendinstown, Co Carlow. The proposed development will consist of: • A c. 63MW solar farm comprising ground mounted solar photovoltaic panels. • 15 No. Invertor Combiner Kiosk /Transformers and hardstands. • 1 No. Ring Main Unit. • 2 No. spare parts storage containers. • Provision of site access tracks and upgrading of existing tracks. • Underground cabling within the solar farm site, in private lands and under the L7111, L7114, L7115 local roads to connect the solar farm field parcels, and to connect the solar farm to the permitted Garreenleen Substation. • 3 No. temporary construction compounds. • Demolition of derelict agricultural building and disused silage storage structure. • Upgrading and widening works at Site entrances. • All ancillary development including such as an up to 2.4m high stock proof fence, CCTV and drainage infrastructure. This application is seeking a ten-year permission and a 35-year operational period from the date of overall commissioning of the solar farm. This application is accompanied by a Natura Impact Statement (NIS)

Rathrush Emlicon and Bendinstown, Ballon, Co. CarlowCarlow County CouncilPERMISSION1 reasons0 conditions
Refused31 July 2025