Planning records
Showing 1-6 of 6 public records- RED III - for 10-year planning permission for the provision of a Battery Energy Storage System and compound on a site of c. 1.27ha to support the adjacent permitted solar farm (CCC Reg. Ref.: 21/510). The Battery Energy Storage System (BESS) compound will accommodate self-contained Lithium Ion Phosphate batteries, within 14 no. BESS units, and 3 no. twin skid units and a single skid unit. A control room (c. 27.6m2) is proposed to the west of the compound. The proposed development includes for all associated development, boundary treatments, security fencing, site access works, ducting and cabling and all associated ancillary works
For a single storey extension to the main dining room with a retractable roof, a single storey outdoor spa facility consisting of 2 no. ice baths, 2 no. hot tubs, 1 no. sauna pod, a relaxation pod, a changing room pod with toilet facilities and a plant room, signage and all associated site works
Of alterations to previously approved under planning Ref:20/332. Alterations include amendments to site layout and floor plans, elevations, and all ancillary site works
For development of: (a) erect single storey industrial unit for storage (b) alterations to site layout and site boundaries under previously approved (planning Ref:20/332) and all ancillary and associated site works
To (a) demolish 2 No. existing derelict semi-detached dwellings, (b) erect 6 No. fully serviced dwellings in two terrace blocks (consisting of 5 no. 2 bed two storey units and 1 no. 3 bed two storey unit), (c) install pumping station, (d) form service road and (e) connect to public services and all associated works
To amend the approved development (Planning Reference: 16/507) of a temporary (25 years) solar farm to include photovoltaic panels with mounting frames on screw pile foundations, inverters, transformers, substation, DNO building, communications building, security fencing, pole mounted security cameras, minor upgrades to existing site entrance and all other ancillary works. It is expected that the proposed development will have an output of up to 5 megawatts (MW). Amendment proposed is as follows: increase the output from 5 Megawatts (MW) to 7 Megawatts (MW)