Planning records
Showing 1-50 of 640 public recordsTo build a new house, garage, install a waste water treatment system and all associated and ancillary site works
For the construction of a new two storey dwelling house, detached domestic garage, wastewater treatment system and percolation area, upgrading of existing site entrance and all ancillary site works
To Extend the Appropriate Period of Planning Permission P16-776 to carry out the following works, the Demolition of an existing dilapidated two storey ruin, the construction of a new dwelling house, garage, site entrance, sewage treatment system with percolation area and all associated ancillary site works
For change of finishes to that granted in planning permision number 16/776 & 21/137. Proposed change is as follows: Natural slate to be removed from granted finishes for the roof and proposal change to a standing seam metal roof
The development consists of the construction of an extension onto existing slatted unit and associated site works
For the following works: to construct a new dwelling house, garage, new site entrance, wastewater treatment system and percolation area and all associated site works
For development, the development consists of the construction of agricultural loose house and associated site works
For development, the development consists of the construction of an agricultural loose house and ancillary works
To demolish existing boiler house and learning support room and to construct a single classroom extension to include the provision of a new sewage treatment system and decommissioning of existing septic tank with all necessary ancillary works.
To carry out the following works. The demolition of existing side and rear extensions to existing dwelling, construction of a new extension to the rear and side of dwelling, along with all associated site works and services, to include a new wastewater treatment system, and bored well, using existing entrance from public road
For the construction of a Community Childcare facility including shared use community rooms and all associated site works. Note the proposed building is an amended building from previously granted development under Planning permission number: 20/55
For the following works 1. to RETAIN a prefabricated structure containing a classroom, resource room and pupil toilets, a timber structure being used as a store, timber entrance gate and fencing and all associated site works. 2. Full PLANNING PERMISSION for the construction of a Community Childcare facility, including shared use community rooms and all associated site works
To restore existing cottage, construct new addition to side of existing cottage, convert 2 No. Sheds to studio spaces, install a proprietary wastewater treatment system with percolation area and all associated site works
To carry out the following works: the demolition of existing rear extension, construction of a new extension and modifications to existing dwelling house with all associated works, using existing connections to wastewater system, bored well and existing entrance from public road
To Extend the Appropriate Period of a Planning permission P16/798 for the construction of a two-storey dwelling house, entrance and access driveway from existing public road access, new waste water treatment system and associated works
Of the rear extension to existing dwelling consisting of a kitchen/dining area and a living room together with ancillary site works
To extend the Appropriate Period of Planning Permission P17/418, construction of a dwelling house, garage, treatment unit & all associated services
Of (1) upgrade of septic tank previously permitted under P8/21873 to treatment unit and soil polishing filter and (2) polytunnel and storage sheds
To construct a dwelling house with a wastewater treatment plant, percolation area, removal of the partially demolished foundations and remaining debris of demolished house, which was previously granted under Planning Reference No 98/1044, reuse of previous site entrance location of Planning Reference No 98/1044 and all associated site works. The application includes a Natura Impact Statement Report. Gross floor space of proposed works: Dwelling House = 153.75m².
For the construction of a dwelling house, garage, effluent treatment system and all associated services
For the following works: to construct a new pedestrian access gate, gravel walkway, timber post and rail fence and all associated site works. This development is located within the East Burren complex SAC. A Natura Impact Statement will be submitted to the planning authority as part of this planning application
The development consists of the construction of a slatted unit and associated site works
To construct a new vehicle entrance, car parking and all associated site works. This application will be accompanied by a Natura Impact Statement.
To construct a new ball wall with safety netting and fencing, replacement of existing septic tank with a new wastewater treatment unit and percolation area, a new sand storage area/wall with adjacent open storage shed and all associated site works
For the following works: to construct a new community playground with safety surface, fencing and all associated site works
The development which will consist of the construction of new dwelling along with garage, waste water treatment system, including polishing filter and associated site works. A Natura Impact Statement (NIS) will be submitted to the Planning Authority with the application
Is sought for the construction of a dwellinghouse, domestic garage, septic tank/ proprietary treatment system and for all ancillary services and site works
For development, the development consists of the construction of a slatted unit and associated site works
For the construction of a new Sheep shed, Sheep handling facility and a new Cattle Handling Facility along with all associated ancillary concrete works
To construct a detached single storey dwelling house, new site entrance, wastewater treatment system, percolation area and all ancillary site works.
Of the site entrance and internal parking area along with associated site works
The development will consist of construction of an extension and modifications to existing dwelling house with all associated works, using existing connections to wastewater system, bored well, and existing entrance from public road
For the construction of a dwelling house, garage, treatment unit and all associated site works. A Natura Impact Statement will be submitted to the Planning Authority with the planning application
To construct an agricultural loose house, stables, horse walker, lunging ring and dungstead along with other necessary ancillary works
To alter and extend an existing house with a dormer-style extension, to replace an existing on-site wastewater treatment system, alterations to an existing site entrance and associated site works
To construct a new dwelling house, construct a new entrance, set back a section of the roadside boundary to improve sight distance and install an advanced wastewater treatment system along with all associated site works
For the construction of a dwelling house, garage, wastewater treatment system and all associated services
To construct a detached dwelling house, domestic garage, waste water treatment system, new entrance, connection to necessary services, boundary treatments and all associated site works
For development which will consist of the construction of a dwelling house, garage, a proprietary waste water treatment system and ancillary site works
For the construction of a dwelling house, garage/store, a proprietary waste water treatment system and ancillary site works
Is sought for the construction of a dwelling house, domestic garage, septic tank / proprietary treatment system and percolation area and for all ancillary services and site works
To demolish an existing ruin and build a new dwelling house with garage, install a waste treatment system upgrade the existing entrance to the public road and all associated site and ancillary works
To construct a temporary modular school building consisting of 2 no main stream classroom, 2 SET rooms and a principal's office together with an onsite sewage treatment system with all necessary ancillary services. The new school building to remain in use until a new permanent school building is constructed and ready for occupation, this will be the subject of a separate planning application
The development will consist of (a) replacement dwelling house (b) renovation and reuse of existing barn (c) upgrading domestic wastewater treatment system (d) retaining existing sheds (e) associated site works and services
To construct a dwelling house, septic tank with percolation area and ancillary site works.
For the construction of a dwelling house, wastewater treatment system and new entrance including ancillary site works
To erect 715.00 m2 or 143.29 kW of photovoltaic panels on the roof of existing commercial building with all associated site works
To construct a dwelling house, garage, waste-water treatment system and soil polishing filter together with all ancillary site development works and services
For the refurbishment and partial change of use of the existing Carron Research Station at Fahee, Carron, Co Clare. The proposed works will include minor modifications to the building elevations, modifications to the entrance for universal access, construction of a plant room and a standalone storage shed, provision of PV panels, material change of use of existing dormitory accommodation to research labs/offices and a self-contained 2 bedroom apartment, widening of the existing entrance, provision of EV accessible parking and all associated works. The site is located in close proximity to the East Burren Complex Special Area of Conservation (SAC) and a Natura Impact Statement (NIS) has been prepared and will be submitted to the Planning Authority with the planning application
For development, the development consists of the construction of an extension to existing agricultural building which will consist of roofing existing concrete yard, new slatted tank, new cubicle area, new milking parlour replacing old section of existing building and associated site works