Showing 1-50 of 2,268 public recordsTo renovate and to construct an extension to the side and rear of the existing dwelling with all associated site works
Alterations to previously granted planning application PL. No. 23/60002 to include change of roof type and change to rear elevation, and all associated site works
The construction of a single storey extension to my existing garage, and all associated site works
1) Alterations and dormer roof type extension with 1st floor area to the existing bungalow dwelling. 2) Domestic garage with demolition of existing extension to house and sheds, upgrade of existing septic tank and percolation area including all associated site works
The construction of a portal frame extension to the side of the existing building and all associated site development works, existing barrel-roof shed to be demolished
Is sought for revised plans previously permitted permission PL23/60060
Permission is sought to retain floor slab as constructed and full planning permission is sought for the completion of dwelling house as granted under PL Ref:17/180, full planning permission is sought for the alteration of site boundary as granted under same, all ancillary site works and services
A ten-year planning permission for a solar energy development with a total site area of 77 hectares comprising (i) photovoltaic solar panels on steel mounting frames; (ii) electrical inverters; (iii) electrical power stations; (iv) underground electrical and communications cabling; (v) containerised battery energy storage facility; (vi) the upgrade of 2 no. disused site entrances, decommissioning of 2 no. existing site entrances and development of 1 no. new site entrance; (vii) on-site access tracks; (viii) a temporary construction compound; (ix) security fencing and security gates; (x) pole-mounted security cameras; and (xi) all associated site and ancillary site development, landscaping and reinstatement works. The operational lifetime of the proposed development is 35-years. The planning application is accompanied by an Environmental Impact Assessment Screening Report and an Appropriate Assessment Screening Report
Construction of a single storey dwelling, garage, on-site wastewater treatment system, connection to mains water supply, new splayed entrance and all ancillary site works
1) Permission for retention of sun room constructed to side of existing dwelling 2) permission for retention of detached domestic garage and 3) permission to construct proposed extension to side of existing dwelling consisting of a Physiotherapy Room and all associated site works
Permission for the removal of 3 No. single storey prefabricated units (total floor area =184 sqm), decommissioning of existing septic tank and percolation area, and the construction of a single storey 2 No. Classroom Special Education Unit (floor area = 439 sqm) to the rear / side of existing single storey School Building (floor area = 1,412sqm), provision of a new proprietary waste water treatment system and sand polishing filter, together with an enclosed external soft play area, sensory garden, 6 no. additional car parking spaces, and all associated site works.
The change of usage from holiday home use to permanent residential use
The development will consist of:- Internal reconfigurations at ground floor level to provide an additional 11 no. bedrooms, enlarged beauty salon, treatment room, nurses station and relocated toilets, stores and staff areas. Ancillary alterations to elevations and all associated site works and services.
10-year permission. The development will consist of the construction of (i) a Solar PV development comprising photovoltaic panels laid out in arrays over a total development site area of ca. 91.2ha, (ii) the construction of a 38kV substation building ((6.1m (h) x 20.9 (l) and 7.3 (w)) and associated compound area, a transformer unit (ca. 6m x ca. 3.6m) and associated bund, (iii) 352 number Battery Energy Storage System units comprising 22 modules (ca. 21.9m x ca.5.2m) each with 16 number cabinet units within each module and (iv) all ancillary development including 15 number transformer integrated units (ca. 10.5m x ca.2.7m), 12 number inverter units (ca. 6.0m x ca.2.4m), 7 number CCTV cameras mounted on 4m high poles, a 3m high acoustic barrier, with berm and fencing, perimeter security fencing, site access, site egress and all ancillary works and services. The development will have a 40-year operational lifetime. Permission currently exists for a PV development on ca/65.6ha of the site (Planning Permission Ref No. 21/23) that will be superseded by this application if approved
To construct a single storey extension to the front and side of existing part single storey, part two storey dwelling, relocation of existing entrance, upgrade of existing percolation area and all associated site works
10 Year permission for development consisting of the construction of a Solar PV development comprising photovoltaic panels laid out in arrays over a total development site area will be ca. 65.6 ha, the construction of a 38kV substation (ca 114.4m2 x 4.75 tall) a transformer unit (ca. 18m2 x 4m tall) and associated bund (ca. 55m2), along with ancillary development including; 24 no. Power Hubs (ca. 15.25m2 x 2.4m) which incorporate an inverter and a transformer, 1 no. single storey communications building (11.1m2 x 2.5m), 1 no. single storey client side sub-station building (15.25m2 x 2.9m), 1 no. single storey equipment storage building (7.5m2 x 2.7m), 10 no. CCTV cameras mounted on 4m high poles, perimeter security fencing, site access, site egress and all ancillary works. Permission currently exists for a PV development on part of the site (Planning Permission Ref No. 16325). An Natura Impact Statement will accompany the planning application.
1. retention permission for a domestic shed as constructed, 2. permission for completion of same and all associated site works
No 1. Retention Permission for a mobile home used as a dwelling for a period not exceeding 3 years, No. 2. Permission for demolition of an existing single storey dwelling in ruins, permission for the construction of a replacement single storey dwelling, connection to services, septic tank, & percolation area and all associated site works
For an unauthorised mobile home used as a dwelling, connection to services and all associated works
To construct a part single storey, part two storey dwelling, detached single storey garage, new entrance, bored well, waste treatment system, percolation area and all associated site works
Renovate existing cottage including a single storey extension, new bored well, septic tank, percolation area, upgrade existing entrance and all associated site works
Permission for the development of a grain store, concrete yards and ancillary works
Permission for the erection of an overground slurry store, dry store, concrete yards, and ancillary works
To construct 1) A two storey House, 2) Septic tank and percolation area. 3) Bored Well. 4) A domestic vehicular entrance. 5) All ancillary ground works in association with the above
The installation of a 15 metres monopole carrying antennas, Dish, RRU's (Remote Radio Units), Cabinet, Fencing and Access gate together with Ground-based equipment and all associated site development works for wireless data and broadband services
A single storied dwelling, garage, new entrance/driveway, effluent disposal system to comply with current EPA code of practice, provision of a well and associated site works
The erection of 8 no. 21m high flood lights to the perimeter of the existing football pitch and all associated site works. There will be 4no. Lighting column of each side of the pitch to provide enough luminance on the pitch to allow football/hurling matches to be played.
The change of use from Agricultural Land to 1 No. GAA Pitch
Development to construct an extension to the rear of the existing domestic dwelling and associated ancillary site works
For proposed works which will include a solar farm on an area of approximately 27.0 hectares, comprising photovoltaic panels on ground mounted frames, 1 No., onsite 38kV substation, an energy storage system (4 No. units), 10 No. single storey inverter/transformer stations, security fencing, a palisade double security gate, 2 No. storage containers, CCTV, a temporary construction stage wheelwash system and all ancillary development works. Elgin Energy Services Ltd are applying for the proposed solar farm to have planning permission that is effective for 10 years (and an operational period of 35 years). The planning application incudes a Natura Impact Statement
The erection of a slatted cattle shed, concrete yards and ancillary works
A dormer style extension at first floor level to existing dormer style dwelling and all associated site works
To retain existing single storey dwelling house and site entrance as constructed and full planning permission is sought for the completion of same, all ancillary site works and services
Retention Planning Permission to retain log cabin style dwelling house and site entrance as constructed, all ancillary site works and services.
(i) the demolition of the existing two storey pitched roof dwelling and ancillary outbuildings; (ii) the construction of 18 No. townhouses each with private amenity space/private rear gardens in 7 No. two-storey semi-detached/terraced blocks, with rooflights; (iii) new vehicular and pedestrian entrance on the front (North East) site boundary off Thomas Traynor Road; (iv) provision of internal access road and pedestrian footpath to serve each of the 18 No. proposed townhouses; (v) provision of 36 No. in-curtilage parking spaces; (vi) communal open space, associated boundary treatment, landscaping, drainage and all associated works to facilitate the development. A Natura Impact Statement is submitted with the application.
Retention permission for alterations to existing dwelling house to include an attic conversion at first floor level, a single storey extension to the front and rear and an attached double garage to the side. Retention is also sought for an existing second entrance and planning permission to decommission this entrance and all associated site works
To construct a part single storey, part two storey dwelling, detached single storey double garage, new entrance off existing laneway, bored well, waste water treatment system, percolation area and all associated site works
For proposed works to include a solar and storage park on an area of approximately 68.8 hectares, comprising linear arrays of solar photovoltaic panels mounted on steel supported structures with associated cabling and ducting (including cable connection to the proposed onsite 110 kV tail fed substation), 50 inverter substations, a storage park (including 30 no. containers with battery cells, transformers and power conversion units), perimeter fencing, 8 no. palisade double security gates, 3 no. temporary construction compound/material storage areas, 6 no. steel storage containers, 17 no. turning bays, CCTV, a temporary construction stage wheel wash system and all associated ancillary development works. Elgin Energy Services Ltd. are applying for the proposed development to have planning permission that is effective for 10 years (and an operational period of 40 years). A Natura Impact Statement (NIS) has been prepared and will be submitted to the planning Authority with the Planning Application.
A new single-storey kitchen, dining area and solarium and a new waste water treatment system
To construct 3no. additional mushroom growing tunnels, hardstand area and all associated site works at existing mushroom growing facility
Of the relocation of the following: a treatment system and percolation area, 3 no. mushroom growing tunnels and packing room, granted under PL17/305 and planning permission to construct 3 no. additional mushroom growing tunnels and all associated site works
For the retention of a biomass boiler and storage silo facility and all associated works
Retention permission for alterations to existing single storey garage. Alterations to include a raised roof section to the rear (originally a flat roof now pitched) and variations to external façade (side elevation only) and all associated site works
Retention permission for the change of use from original single storey garage and shed to domestic use (1 bed unit), associated utility area and storage. Retention permission is also sought for the alteration from part of original flat roof area to a pitched roof, minor external alterations, velux windows to side, connection to existing services and all associated site works
For the change of use from existing garage and shed to domestic use (1 bed unit) associated utility area and storage, permission to roof existing flat roof area, minor external alterations, velux windows, connection to existing services and all associated site works
Permission for new private dwelling with detached garage, private well, wastewater treatment unit and percolation area, new entrance and all associated site works
To convert an existing single storey dwelling into a storey and a half dwelling. Planning permission is also sought to extend an existing attached garage (remaining single storey), boundary treatments & all associate site works
Planning permission to modify a previously granted planning permission to facilitate an increased output from 10 MW to 20MW at the Coppenagh Solar Park development permitted pursuant to permission ref no: 22/272. Increased output is being facilitated arising from improved technological advancements and availability of Grid Capacity. No other alterations to design, siting layout etc are proposed.
Application for a five year planning permission for the development of the following elements: The erection and operation of a photovoltaic energy development which includes the erection of a c.20.9 ha fixed panels on ground mounted frames with an export capacity of c. ten mega-watt, 1no. energy storage compound, customer switchgear container, 1no. DSO substation which will be connected to the national grid, electrical transformer and inverter units on an overall site area of c. 22.45 ha, underground cabling and ducting, spare equipment container, boundary fencing, security entrance gates, CCTV, internal access road and all associated ancillary activities. The proposed development will have a projected lifespan of 35 years.
To retain machinery shed as constructed and full planning permission is sought to construct a Grading Shed, all ancillary site works and services