19328: Of a partially complete domestic shed as built. Planning permission for the completion of same shed and for all other associated ancillary site development works
Garryhundon, Milford, Co. Carlow
DecisionConditional grant
Decided02 July 2020
Application typeRETENTION
Source documents3
Site
What is on file
0refusal reasons10conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason
No refusal reason is on record for this application yet.
Conditions
- ,1Retain and complete development in accordance with plans received 23/08/19 and amended by FI received 27/01/20 and 12/06/20.Compliance
- ,2Permission authorises only the development detailed in the application; does not cover other site development.Compliance
- ,3External wall/roof finishes, windows, and rainwater goods to match Drawing J642-PL04-001. Render finish neutral in colour and texture.Design Materials
- ,4Shed used solely for purposes incidental to the dwelling. No self-contained dwelling, business, trade or commercial activity.Occupancy
- ,5Do not impair existing roadside drainage. Surface water collected and disposed to on-site soakways/system per BS 8301:1985 and BRE Digest 365. Only clean surface water to soakpits; foul waste to wastewater treatment system.Wastewater Drainage
- ,6Provide off-carriageway parking for construction traffic. Prevent muck/debris on public road. Maintain neat/litter-free site. Control noise and dust emissions.Construction Management
- ,7Sign Irish Water connection agreement prior to commencement. Comply with Irish Water CDS Technical Documentation. Subject to Irish Water Capital Investment Programme constraints.Water Services
- ,8Relocate service poles prior to construction. All ESB, telephone and other cables located underground unless otherwise agreed.Other
- ,9Consult Chief Fire Officer within 4 weeks of final grant and strictly comply with recommendations.Compliance
- ,10Pay development contribution of €970.00 within 4 weeks of permission date. Interest at 5% p.a. applies from grant date.Development Contribution
Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
- Notification Of DecisionSource: carlowcoco.eplanning.ie / F24a42dd-2593-4e64-913d-1dfe4daf5949.pdf / Document 90335Source PDF
- Planners ReportSource: carlowcoco.eplanning.ie / 4873e8cd-dc51-4963-8523-5a0178fe007d.pdf / Document 90334Source PDF
Nearby precedent
Similar nearby applications linked to this planning decision.- 20192The temporary placement of a mobile home on site for the duration of the construction of dwelling house as granted under PL Ref. 19/491 and temporarily connect to services as granted under same, all ancillary site works at services / 0.3 km away / 12 August 2020Conditional grant
- 19491To construct a dormer style dwelling house, garage, septic tank and associated percolation area, bored well, new site entrance, all ancillary site works and services / 0.3 km away / 27 March 2020Conditional grant
- 20109To construct a two storey dwelling house, garage, septic tank and associated percolation area, bored well, new site entrance off existing private laneway, all ancillary site works / 0.4 km away / 27 November 2020Conditional grant
- 2285For the development of a dry store, concrete yard and ancillary works at this site / 0.5 km away / 27 April 2022Conditional grant
- 20409Construction of a residential dwelling; and a detached domestic garage. Other works as part of the development include: on-site EPA compliant wastewater treatment system and percolation area; soakaways; borehole well; vehicular entrance; landscaping; boundary treatment; and all associated works to facilitate the development. / 0.7 km away / 21 January 2021Conditional grant
- 19413For the construction of a residential dwelling, including rooflights and a detached domestic garage. Other works as part of the development include: septic tank and percolation area; soakway; borehole well; vehicular entrance; landscaping; boundary treatment and all associated site works to facilitate the development. / 0.7 km away / 10 December 2019Conditional grant
- 2560436The retention of: a rock splitter and associated ancillary canopy covering an area of c. 120.1sqm with a maximum height of c. 7.2m and associated single storey cabin/site office measuring c. 4.7sqm in area; aggregate washing plant with a maximum height of c. 10.7m; welding shed measuring c. 190.2sqm in area with a maximum height of c. 8.4m; and Electricity Supply Board substation measuring c. 13.5sqm in area with a maximum height of c. 3.2m. Retention is also sought for all associated ancillary site development works, including site levelling, lighting, cabling and ducting / 0.9 km away / 25 February 2026Conditional grant
- 1976For amendments to originally granted planning permission PL18/207 (which consisted of the construction of a new 2 storey detached dwelling, new site entrance, boundary treatments, on-site treatment system and all ancillary site works). The proposed amendments consist of changes in setting out and site levels / 0.9 km away / 18 April 2019Conditional grant