Conditional grantDecided 16 February 2024Carlow County Council

2360302: The upgrades to existing onsite waste water treatment system and new percolation area servicing existing farmhouse including all associate site and landscaping works

Kilcoltrim, Borris, Carlow
DecisionConditional grant
Decided16 February 2024
Application typePERMISSION
Source documents5

Site

What is on file

0refusal reasons28conditions8nearby records

Decision details

Core application dates and identifiers from the public planning record.

Planning analysis

Refusal reasons and planning conditions extracted from the public decision file.

Refusal reasons

No refusal reason

No refusal reason is on record for this application yet.

Conditions

  • 1Development must be carried out in accordance with plans received on 19/12/2023.Compliance
  • 2Permission is strictly limited to the development described in public notices and plans received on 19/12/2023.Compliance
  • 3Wastewater system and percolation area must be designed, constructed, operated and maintained per EPA Code of Practice (2021). Certificate of Compliance required prior to occupation. Existing septic tank to be disconnected and filled in.Wastewater Drainage
  • 4Sight lines at road entrances per DMRB. Road opening works require a Road Opening Licence. Consultation with Municipal District Engineer required for ditch removal at south-east of site.Traffic Access
  • 5Surface water to be collected and disposed of to soakaways per BS 8301:1985 and BRE Digest 365. No surface water runoff to public road or adjoining properties.Water Services
  • 6Prevent muck, dirt, or debris on public road during construction. Control noise and dust. No materials stored on public road/footpath without consent.Construction Management
  • 7Construction hours restricted to Mon-Fri 08.00-18.00 and Sat 08.00-13.00. No work on Sundays or Bank Holidays.Construction Management
  • 8Service poles requiring relocation must be moved prior to construction at applicant's expense. All cables to be located underground.Other
  • 9Design and install soakaways in accordance with BRE Digest 365.Wastewater Drainage
  • 10Install vents at the ends of the proposed percolation pipes.Wastewater Drainage
  • 11Maximum of 6 distribution pipes originating from a single distribution box.Wastewater Drainage
  • 12All percolation pipes must originate from the distribution box.Wastewater Drainage