Planning records
Showing 1-14 of 14 public recordsWorks to existing dwelling to include a single storey extension the West elevation, changes to existing roof, and elevations and all associated site works
• the replacement (“restringing”) of the existing overhead line circuit conductor wires with a new higher capacity conductor • the strengthening of foundations at 7no. locations • shear block remedial works at 77no. locations • the strengthening of towers (i.e., member replacement) at 34no. locations • the replacement of 5.1km of earthwire • the painting of all structures • the replacement of insulating and ancillary hardware at structures • all associated works within the existing Kellis 220kV substation to accommodate the uprated 220kV OHL including uprating of the Great Island bay in Kellis 220kV substation • the installation of a temporary link between the Great Island – Kellis and Dunstown = Kellis 220kV OHLs to create a temporary circuit, which will include the erection of a temporary four-pole timber structure between the existing Angle Mast 191 on the Great Island- Kellis circuit and the existing Angle Mast 157 on the Dunstown – Kellis circuit • all associated temporary site development works to gain access to the existing structures including vegetation clearance and management, disassembly and reassembly of gate posts/piers and removal and reinstatement of existing fencing, and • other temporary associated and ancillary site development works required for the purpose of the uprate of the existing circuit, including construction compounds, silt traps, silt fences, vegetation clearance and management, stone tracks, ground protection mats, infrastructure crossing support systems (i.e., guard poles) and temporary watercourse crossings. Where required, an aerial catenary stringing system (ACSS) will be used to facilitate stringing operations over major obstacles, e.g., busy national roads, wide rivers, etc. A Natura Impact Statement will be submitted to the Planning Authority with the application. Please see Site Notice for full development description
The development will consist of a new Wastewater Pumping Station, two new kiosks (kiosk one 3.6m x 0.8m and kiosk two 2m x 1.8m, each 1.8m high), a new 50m3 below-ground storage tank, ground mounted solar PV array (30m2 total), new palisade perimeter fencing and gate (each 2.4m high), all on a site of 0.04 ha; the widening of the existing access road and the existing access to the R724, associated demolition of existing boundary wall and gate; a new 100mm diameter rising main (360m) and 225mm gravity sewer (190m) on the R724 between the proposed pumping station and Royal Oak Road; and all ancillary works. A Natura Impact Statement (NIS) will be submitted to the planning authority with the application
To construct a two storey dwelling, detached single storey double garage, upgrading of existing entrance, bored well, waste water treatment system, percolation area and all associated site works
Proposed extension, single & double story height extension to; front, rear, side façade, new doors & windows, new external insulation & render works
(1) the phased demolition of existing school buildings, including the phased decommissioning and removal of existing temporary school accommodation units, (2) the phased construction of a new 1- and 2-storey school building, to cater for a total of 750 no. pupils, with a total gross internal floor area of 7,752m2, incorporating 27no. general classrooms and associated support teaching and tech spaces, a special needs unit, a general purpose/dining hall, a library, offices and meeting rooms, and other ancillary accommodation, and to include photovoltaic panels at roof level, (3) the construction of a new, separate sports hall building with a total gross internal floor area of 1097.9m2, incorporating a multi-use hall and associated changing and equipment storage spaces, a fitness suite, a meditation space, general storage spaces, and other ancillary accommodation, (4) the provision of a new grassed sports playing pitch in the western part of the site, 5no. hard surface ball courts to the north of the new school and sports hall buildings, outdoor seating and breakout areas, a special needs unit garden, a tech yard, an external material and bin store (133m2), a new substation and switchroom (24.5m2), Liquid Petroleum Gas (LPG) and Air Source Heat Pump (ASHP) compounds, hard and soft landscaping with footpaths, public lighting, and all associated boundary treatments, (5) modifications to the existing site entrance arrangements to include a minor realignment of the existing vehicular and pedestrian entrance from the south, and the provision of a new, gated pedestrian access from Eastwood to the north, (6) parking and access arrangements to include modifications to the bus set down areas and to the internal road layout, and parking provision for 87no. cars, inclusive of 5no. disabled spaces and 5no. electric vehicle charge points, 125no. sheltered bicycle stands providing 250no. sheltered bike parking spaces, and 10no. uncovered bicycle stands providing 20no. short stay visitor bike parking spaces, (7) new foul and surface water drainage system works incorporating SUDS measures, attenuation, rainwater harvesting, and all other associated site and development works. A Natura Impact Statement has been prepared in respect of the proposed development
The construction of a portal frame storage unit with the installation of solar photovoltaic panels mounted to roof of same, with all associated ancillary site development works
The erection of 8 No. 21m high floodlights to the perimeter of the existing hurling pitch and all associated site works
For the proposed alterations to existing dwelling, erection of ground floor and first floor extensions and all associated site works
Permission for the proposed erection of a fully serviced dwelling house and all associated site works
Permission for an extension to existing workshop buildings to be constructed in 2 phases
The construction of an onsite wastewater treatment system, consisting of wastewater pump station, over ground rising main, sludge tank, balance tank, aerobic digester, control room and all associated site works. Retention planning permission is sought for the erection of 2 No grain silos, 2 No gas silos and 4 No Multi-Purpose Vessels with all ancillary site works
(a) the change of use for part of existing portal frame building, from recreation centre to light industrial packaging / manufacturing area and visitor area. (b) External and internal alterations to include demolition of existing internal walls and alterations to roof structure and finishes. (c) The construction of an E.S.B. substation to include switch room and all ancillary development works
For the demolition of an existing house and out-buildings. The construction of 7 houses consisting of 6 number semi-detached units with 4 beds (130sqms each) and one detached unit with 4 beds (157sqms). The development would take vehicular access from Hurley's Lane. The development includes all car parking, boundary treatments, hard and soft landscaping, drainage and underground services and associated site development works as required